VISCARIA RESTARTS ITS COPPER MINE with Jernbro as partner
As Viscaria prepares to reopen its copper mine outside Kiruna, extensive installations are required to pump out and treat the water that has filled the mine during its downtime. Jernbro is responsible for the piping and mechanical contracting in the new water treatment plant – a technically demanding assignment that is vital for the restart.
CASES AND STORIES
-
Installation and assembly, PrefabricationThe indispensable metal – and the partnership building the next phaseCopper is rarely seen. But without it, industry stops. Among other things, it carries electricity in our grids, powers machines in factories, and is a prerequisite for electrification. At the same time, supply is very limited – and demand is growing rapidly. It is in this context that Viscaria plays a crucial role.Read more -
Solutions, Turnaround and shutdownTurnaround without compromiseIn 2025, Jernbro carried out TAR 25 at Equinor’s refinery in Mongstad, Norway – one of the most extensive and technically demanding turnarounds at the facility in recent years. The project included mechanical work, piping and welding on critical process systems and equipment, and was executed in a complex, operations-critical environment.Read more -
Electrical solutions, Installation and assemblySSAB strengthens operational reliability of hot rolling millJernbro has, in collaboration with main contractor ABB, played a central role in SSAB’s modernization of its hot rolling mill in Borlänge. To future-proof availability, energy efficiency and stable operation, new drive equipment has been installed. This is an important investment for both the region and the green transition.Read more -
Welding, Svejsning, Svetsning, Turnaround og shutdown, VedligeholdelsePlant back in operationWhen energy must be produced, security of supply is essential – even when the boiler fails just before Christmas in Denmark. During periods of high load, there is no room for prolonged shutdowns, and a failure of key components can have a direct impact on both production and supply. This places demands on rapid mobilization, technical oversight, and safe execution from day one.Read more -
Installation and assembly, PrefabricationViscaria restarts its copper mine with Jernbro as partnerWhen mining company Viscaria set out to reopen its copper mine outside Kiruna, extensive installations were needed to pump out and purify the water that had filled the mine during its years of downtime. Jernbro was entrusted with responsibility for the piping and mechanical contracting in the new water treatment plant. The assignment is technically demanding and plays a crucial role in the future of mining operations in the region.Read more -
Relocation and rebuildsComplex rebuild completed without incidentsWith this reactor assignment, we resolved a case characterised by technical challenges, a changed scope, and extensive requirements for inspection and documentation. The work ranged from internal repairs to a complete rebuild of the reactor head. Today, the facility is back in stable operation at Equinor.Read more
DON’T MISS A BEAT
Stay informed – subscribe now for Jernbro’s latest news, technical insights, and customer success stories.