Close movie

Specialist workshop with
professional staff
within assembly of
pipe components

We have great expertise within installation of pipe components for pipes and hoses, such as installation of pipe streets and one-to-one replacements. We will help you to replace broken components (for example pipe fittings) with new ones or to carry out installation of completely new parts.

ledningskomponenter

Short lead times

We strive to have as short lead times as possible for our work. We do this because we know that it contributes to short downtimes for our customers in the industry throughout Sweden.

Through our wide network of suppliers, we can also provide and sell new management components in a short time.

Guidance

With our broad experience, we are helpful in solving your specific problems. Contact us for advice, and we will come up with a solution that suits your needs.

Quality

With great competence, we assemble high-quality pipe components. The condition of the components is often decisive for the quality of the end product. With great knowledge and accuracy, we guarantee a good result.

curious to know more?

Select contact

Michael Gunnarsson, Group Manager Pipes & Plumbing Avesta +46 10-483 13 55 Email

Contact undefined

    You might also be interested in

    Maintenance

    Through acrobatics, all cramped spaces could be painted

    At Freudenberg Home and Cleaning Solutions AB, Jernbro has completed a large painting project of 50 sqm. It's beams and metal roofs adjacent to the production halls that have been painted. Several spa…

    Engineering

    Lifting devices with power to lift 25 to 80 tons are built for Siemens

    When Siemens Energy AB was about to build new lifting devices to their test rigs for gas turbines, they turned to Jernbro for function and design.

    Component servicing

    PAROC has placed a new order with Jernbro

    PAROC in Hällekis has signed the concept called overhaul with Jernbro.

    Maintenance

    Upgraded traverse at Outokumpu

    Upgraded traverse in an old mill environment which now has a lifting capacity of as much as 60 tonnes.

    share this