Reactor rebuild

With this reactor assignment, we resolved a case characterised by technical challenges, a changed scope, and extensive requirements for inspection and documentation.

The work ranged from internal repairs to a complete rebuild of the reactor head. Today, the facility is back in stable operation at Equinor.

Challenge

The collapse created a need for extensive repairs and replacement of reactor components such as quenches, grids and brackets.

The work also included demanding welding in the shell with a material thickness of 50 mm under strict quality requirements.

Solution

The rebuild covered internal components, the shell and the reactor head and was carried out around the clock.

As part of the project, a new WPQR was qualified in accordance with the customer’s requirements, followed by extensive reactor welding – including in the 50 mm-thick shell – with full NDT inspection throughout all phases (RT, PAUT, MPI, HT).

The reactor head was reinstalled, the inlet rebuilt, and catalyst loaded in close collaboration with Buchen.

Results

The project was completed with approx. 8,000 working hours without incidents.
The reactor is now back in stable operation.

· Extensive welding work (approx. 120 passes, ~300 kg of welding consumables used)

· Access conditions have been re-established with a steel structure, and all tests were approved prior to commissioning.

Why choose Jernbro

  • Proven safe project execution – without incidents
  • High flexibility and the ability to manage changes and additional work
  • Proven experience with advanced welding in thick-section material combined with extensive NDT
  • Proven ability to deliver under time pressure
Business inquiries

By submitting this form, you consent to Jernbro processing your personal data in order to handle your request. Your information will be used in accordance with our privacy policy, where you can also read more about how we process personal data and your rights under applicable data protection laws (GDPR).

CONTACT US today

We value a good conversation – so please call if you have questions, need help or want to discuss an idea.

If you prefer to write to us, you can use the customer contact form – and we will get back to you quickly.
headshot of Chano Thaarup Erlandsen

Chano Thaarup Erlandsen

Head of Projects

cth@jernbro.dk

+45 2575 1049